Projects

150 Holborn

Project Value: Confidential

Overview

This project at 150 Holborn involved comprehensive site setup and protection works delivered by Tilbury Douglas (Paragon division). The scope focused on safe guarding key areas during the construction phase, particularly Levels 5 and 6, lift lobbies, and primary access routes. Works included the installation of window protection using correx, protection to W/Cs, and the application of heavy-duty Tecdura along construction and goods routes. Additional measures included mullion protection using foam systems, alongside the creation of designated laydown areas for subcontractor materials and fully functional welfare facilities.

A comprehensive welfare setup was also delivered, including a tea point, changing, and drying rooms, and a multi-faith room to support work force wellbeing on site.

Challenges

The main challenges were delivering a full site setup within a tight programme while working in a live construction environment. High traffic across Levels 5 and 6 and within lift lobbies increased the risk of damage, and limited space made it difficult to coordinate protection works, material storage, and subcontractor access at the same time.

Approach

These challenges were overcome through careful planning and efficient sequencing of works. Protection to floors, windows, W/Cs, and mullions was installed quickly using durable materials such as Tecdura and correx, ensuring areas remained protected despite on going site activity. Laydown areas wereclearly organised to manage materials, and welfare facilities were set up alongside protection works to keep the programme on track and minimise disruption within the live site.

Client
Confidential
Location
London, UK
size
Levels 5 & 6
Duration
2 Week Site Set up Programme
project
value
Confidential
Logistics
value
£35,000
Sector
commercial
Services
  • Internal protection systems installation
  • Floor protection to construction and goods routes
  • Windowand W/C protection
  • Mullion protection with foam systems
  • Site logistics and material management (laydown areas)
  • Welfare facility installation of tea point, changing room lockers and benches
  • Installation of site branding and signage